2008 Plan of Action
31 December 2007 – 9:01 amSince the New Year is right around the corner, I worked on a plan of action for 2008. A way to get myself organized as far as which projects are priority to finish, which need progress, which need to be started and completed before the year is up, etc.
So I wrote it all down, and now feel like I have a handle on things. First things first, Finish Nez’s Afghan. Then finish Smitten (Amelia’s cardigan). Then finish the crochet tablecloth. I’m just about done with the afghan and it’s coming out fabulous. I really like it. I have one more border to work (12 rows of ripple), then 6 rounds of edging and weaving in a zillion ends. Smitten needs a sleeve finished, another sleeve worked, then it’s on hold til I either can find some more yarn via Ravelry, or til February when Knit Picks will have available the colorway I need. I’m short 2 skeins to finish the left front piece. :( Hopefully the weather will hold so that when I do finish it, Amelia will get some use out of it before spring arrives. The tablecloth is crochet thread. I think I’m more than 1/2 way through the required rounds. And it’s only about 36″ in diameter so it shouldn’t take too long. And I actually like doing thread crochet. So it should go pretty quick. If I finish the blanket and what I can do on Smitten before I get more yarn, then I’ll work on the tablecloth while I wait.
Once all that is finished (I’m guessing about Feb or March), then I start on the Christmas projects. I ordered a kit from Annie’s Woolens for a knit stocking. I plan to make it for Amelia because she doesn’t have her own stocking yet. Last year we used one that DH had given to me when we got engaged. If it goes well, then I will make one for myself and for DH, so we all have handmade stockings. I’m keeping it to those 3 items. But before I start on that, I think I’m going to make a few snowflake coasters. I’ve never done fair isle before, and I’d rather practice on something small before I tackle a project as big as the stocking.
I’m also working on the woven afghan. I can make 2 squares in less than 2 hours while watching television in the evenings. So this is a great break away from all the other intense projects.
In addition to all that, I want to get some decent progress done on the Gingham and Ruffles granny square afghan and the bear claw knitted blanket. No rush to get them finished, but I do want to make some significant progress.
Then if time permits during all of this, I’d like to make a few loom knitted items. I’m thinking of trying out the Irish Hiking scarf modifying the pattern (as needed) for the loom. I think it would be good practice and fun to do.
So that’s the gist of my plan for 2008. I’m well on my way as I spent most of the weekend working on the afghan for my sister. And it feels good to have some sort of plan for finishing my WIPs and getting some stuff done that I really would like to have made before the year is over.







Post a Comment